top of page

How to choose the right procurement method and construction contract?


There are many different procurement methods that can be used in construction projects, and the right method for your project will depend on a variety of factors, including the size and complexity of the project, the availability of funding, the level of risk involved, and the preferences of the owner. Some common procurement methods for construction projects include:

  1. Design-bid-build: This is the traditional procurement method, where the owner hires an architect or engineer to design the project, and then solicits bids from contractors to build the project.

  2. Design-build: In this procurement method, the owner contracts with a single entity (a design-build firm) to both design and construct the project. This can be a more efficient process because it allows for more collaboration between the design and construction teams.

  3. Construction management: In this method, the owner hires a construction manager to oversee the project and coordinate the work of subcontractors. The owner may also hire an architect or engineer to design the project.

  4. Turnkey: In a turnkey project, the owner contracts with a single entity (a developer or contractor) to design, build, and deliver the project ready for operation.

There are pros and cons to each of these procurement methods, and it's important to carefully consider all of the options before making a decision. It may also be helpful to consult with an experienced construction attorney or procurement specialist to help you choose the right method for your project.


 



Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page