What is the different between a Cost Plan and A Bill of Quantities?
Both are used to determine the cost or budget of a project, but the difference lies in when and how they are prepared. A cost plan is...


How to Prepare a Bill of Quantities
A bill of quantities (BOQ) is a document that lists all the materials, labor, and services required for a construction project. It is an...

Filling in the RIAI Blue Contract
The RIAI (Royal Institute of Architects of Ireland) blue form contract is a standard form of contract used in construction projects in...


Structural issues and problems with Georgian houses in Dublin
Georgian houses, which were built between 1714 and 1830, are a significant part of Dublin's architectural heritage. They are...

Margin, Markup, Profit | Differences explained with examples in quantity surveying.
Margin, markup, and profit are three essential concepts in quantity surveying that are often used interchangeably. However, they have...

What are IFC files and their importance for quantity surveyors using BIM?
Building Information Modeling (BIM) is a revolutionary technology that is changing the way construction projects are managed. It is a...


What is Open BIM (Building Information Modeling)?
Open BIM (Building Information Modeling) is an approach to creating and managing building design and construction information that...

How to carry out a Rate Analysis of a Construction Project?
Rate analysis is a crucial process that plays a significant role in quantity surveying. It is an essential method that a quantity...

How a quantity surveyor claims Materials On Site as part of payment claim?
As a quantity surveyor, claiming materials on site as part of payment claims is an important process. The materials on site are part of...


How to prepare a Tender Comparison Sheet for Transparent procurement by a quantity surveyor?
In the world of quantity surveying, one of the most important documents is the price comparison sheet. This document is used to compare...