

The Role of a QS — Pre-Contract vs Post-Contract
The role of a QS — Pre-Contract vs Post-Contract URL slug must never change · Service page: roryconnollyqs.ie/cost-plan · ~1,600 words So folks, people ask me this all the time. Rory, what is it you actually do? And I always say the same thing back. The job splits in two halves. Before the builder signs the contract, and after. That's it. Two halves. And they could not be more different from each other. Now, I know that sounds simple. And in some ways it is. But most ho


"The Top Ten Best Ways to Reduction Variations"
Variations are a common occurrence in construction projects, and they can have a significant impact on the budget and timeline of a...


Construction Costs in Ireland
Construction costs in Ireland can vary greatly depending on a variety of factors, including the type and size of the project, location,...























